alb3486676

October 25, 2017 - San Diego, California, U.S. - This entry is built by Caddell Construction Co., (DE) LLC, of Montgomery Alabama and is made from material other than concrete. The six contractors constructing eight prototype border wall sections on Otay Mesa have finished their entries in the competition to build President Trump's border wall. The entries will sit for 30 days then be evaluated as to their effectiveness. (Credit Image: © John Gibbins/zReportage.com via ZUMA Wire). 25/10/2017

October 25, 2017 - San Diego, California, U.S. - This entry is built by Caddell Construction Co., (DE) LLC, of Montgomery Alabama and is made from material other than concrete. The six contractors constructing eight prototype border wall sections on Otay Mesa have finished their entries in the competition to build President Trump's border wall. The entries will sit for 30 days then be evaluated as to their effectiveness. (Credit Image: © John Gibbins/zReportage.com via ZUMA Wire). 25/10/2017
Teilen
pinterestPinterest
twitterTwitter
facebookFacebook
emailEmail

Zu einem anderen Lightbox hinzufügen

Zu einem anderen Lightbox hinzufügen

add to lightbox print share
Haben Sie bereits ein Konto? Anmelden
Sie haben kein Konto? Registrieren
Dieses Bild kaufen. Nutzung auswählen:
Daten werden geladen...
October 25, 2017 - San Diego, California, U.S. - This entry is built by Caddell Construction Co., (DE) LLC, of Montgomery Alabama and is made from material other than concrete. The six contractors constructing eight prototype border wall sections on Otay Mesa have finished their entries in the competition to build President Trump's border wall. The entries will sit for 30 days then be evaluated as to their effectiveness. (Credit Image: © John Gibbins/zReportage.com via ZUMA Wire)
Reportage:
Reportage:
Bildnachweis:
Album / KPA-ZUMA
Freigaben (Releases):
Model: Nein - Eigentum: Nein
Rechtefragen?
Bildgröße:
2400 x 1357 px | 9.3 MB
Druckgröße:
20.3 x 11.5 cm | 8.0 x 4.5 in (300 dpi)
Schlüsselwörter: