alb5501262

JOHN LAING PLC. 3 Minster Court, Mincing Lane, City of London,28/09/1993. Creator: John Laing plc.

JOHN LAING PLC. 3 Minster Court, Mincing Lane, City of London, 28/09/1993. Looking down into the central atrium of 3 Minster Court, showing the curved balconies and suspended escalators. In October 1990, Laing’s London division were awarded the contract for the fitting out of the new London Underwriting Centre at No.3 Minster Court. Key parts of the contract included altering steelwork to enable 16 escalators to be suspended in the atrium, creating dining and kitchen areas on the mezzanine level and the installation of raised floors and suspended ceilings. In August 1991, the team faced a huge setback as the site was severely damaged by fire. The flames swept through the central atrium and burst through the roof. A new Laing team was formed to restore the building after the disaster, and work was finally completed in late 1993.
Teilen
pinterestPinterest
twitterTwitter
facebookFacebook
emailEmail

Zu einem anderen Lightbox hinzufügen

Zu einem anderen Lightbox hinzufügen

add to lightbox print share
Haben Sie bereits ein Konto? Anmelden
Sie haben kein Konto? Registrieren
Dieses Bild kaufen
Daten werden geladen...
Titel:
3 Minster Court, Mincing Lane, City of London,28/09/1993. Creator: John Laing plc.
3 Minster Court, Mincing Lane, City of London, 28/09/1993. Looking down into the central atrium of 3 Minster Court, showing the curved balconies and suspended escalators. In October 1990, Laing’s London division were awarded the contract for the fitting out of the new London Underwriting Centre at No.3 Minster Court. Key parts of the contract included altering steelwork to enable 16 escalators to be suspended in the atrium, creating dining and kitchen areas on the mezzanine level and the installation of raised floors and suspended ceilings. In August 1991, the team faced a huge setback as the site was severely damaged by fire. The flames swept through the central atrium and burst through the roof. A new Laing team was formed to restore the building after the disaster, and work was finally completed in late 1993.
Persönlichkeiten:
Technik/Material:
Fotografía
Bildnachweis:
Album / Historic England Archive/Heritage Images
Freigaben (Releases):
Model: Nein - Eigentum: Nein
Rechtefragen?
Bildgröße:
5265 x 5358 px | 80.7 MB
Druckgröße:
44.6 x 45.4 cm | 17.6 x 17.9 in (300 dpi)