alb9819194

Neckarwestheim nuclear power plant goes offline; reactor GKN 2 is one of the last three to be shut down on 15 April 2023. A historic day in Germany. Nuclear power is history; the nuclear phase-out completed; Neckarwestheim; Baden-Württemberg; Germany; Europe.

Neckarwestheim nuclear power plant goes offline; reactor GKN 2 is one of the last three to be shut down on 15 April 2023. A historic day in Germany. Nuclear power is history; the nuclear phase-out completed; Neckarwestheim; Baden-Württemberg; Germany; Europe.
Teilen
pinterestPinterest
twitterTwitter
facebookFacebook
emailEmail

Zu einem anderen Lightbox hinzufügen

Zu einem anderen Lightbox hinzufügen

add to lightbox print share
Haben Sie bereits ein Konto? Anmelden
Sie haben kein Konto? Registrieren
Dieses Bild kaufen
Daten werden geladen...
Neckarwestheim nuclear power plant goes offline; reactor GKN 2 is one of the last three to be shut down on 15 April 2023. A historic day in Germany. Nuclear power is history; the nuclear phase-out completed; Neckarwestheim; Baden-Württemberg; Germany; Europe
Bildnachweis:
Album / ImageBroker / Arnulf Hettrich
Freigaben (Releases):
Model: Nein - Eigentum: Nein
Rechtefragen?
Bildgröße:
600 x 400 px | 703.1 KB
Druckgröße:
5.1 x 3.4 cm | 2.0 x 1.3 in (300 dpi)