alb5501262

JOHN LAING PLC. 3 Minster Court, Mincing Lane, City of London,28/09/1993. Creator: John Laing plc.

JOHN LAING PLC. 3 Minster Court, Mincing Lane, City of London, 28/09/1993. Looking down into the central atrium of 3 Minster Court, showing the curved balconies and suspended escalators. In October 1990, Laing’s London division were awarded the contract for the fitting out of the new London Underwriting Centre at No.3 Minster Court. Key parts of the contract included altering steelwork to enable 16 escalators to be suspended in the atrium, creating dining and kitchen areas on the mezzanine level and the installation of raised floors and suspended ceilings. In August 1991, the team faced a huge setback as the site was severely damaged by fire. The flames swept through the central atrium and burst through the roof. A new Laing team was formed to restore the building after the disaster, and work was finally completed in late 1993.
Share
pinterestPinterest
twitterTwitter
facebookFacebook
emailEmail

Add to another lightbox

Add to another lightbox

add to lightbox print share
Do you already have an account? Sign in
You do not have an account? Register
Buy this image
Loading...
Author:
Title:
3 Minster Court, Mincing Lane, City of London,28/09/1993. Creator: John Laing plc.
Caption:
3 Minster Court, Mincing Lane, City of London, 28/09/1993. Looking down into the central atrium of 3 Minster Court, showing the curved balconies and suspended escalators. In October 1990, Laing’s London division were awarded the contract for the fitting out of the new London Underwriting Centre at No.3 Minster Court. Key parts of the contract included altering steelwork to enable 16 escalators to be suspended in the atrium, creating dining and kitchen areas on the mezzanine level and the installation of raised floors and suspended ceilings. In August 1991, the team faced a huge setback as the site was severely damaged by fire. The flames swept through the central atrium and burst through the roof. A new Laing team was formed to restore the building after the disaster, and work was finally completed in late 1993.
Personalities:
Technique/material:
Photograph
Credit:
Album / Historic England Archive/Heritage Images
Releases:
Model: No - Property: No
Rights questions?
Image size:
5265 x 5358 px | 80.7 MB
Print size:
44.6 x 45.4 cm | 17.6 x 17.9 in (300 dpi)