alb9819194

Neckarwestheim nuclear power plant goes offline; reactor GKN 2 is one of the last three to be shut down on 15 April 2023. A historic day in Germany. Nuclear power is history; the nuclear phase-out completed; Neckarwestheim; Baden-Württemberg; Germany; Europe.

Neckarwestheim nuclear power plant goes offline; reactor GKN 2 is one of the last three to be shut down on 15 April 2023. A historic day in Germany. Nuclear power is history; the nuclear phase-out completed; Neckarwestheim; Baden-Württemberg; Germany; Europe.
Share
pinterestPinterest
twitterTwitter
facebookFacebook
emailEmail

Add to another lightbox

Add to another lightbox

add to lightbox print share
Do you already have an account? Sign in
You do not have an account? Register
Buy this image
Loading...
Caption:
Neckarwestheim nuclear power plant goes offline; reactor GKN 2 is one of the last three to be shut down on 15 April 2023. A historic day in Germany. Nuclear power is history; the nuclear phase-out completed; Neckarwestheim; Baden-Württemberg; Germany; Europe
Credit:
Album / ImageBroker / Arnulf Hettrich
Releases:
Model: No - Property: No
Rights questions?
Image size:
600 x 400 px | 703.1 KB
Print size:
5.1 x 3.4 cm | 2.0 x 1.3 in (300 dpi)