alb5497890

JOHN LAING PLC. Vintners Place, Upper Thames Street, Queenhithe, London,30/04/1991. Creator: John Laing plc.

JOHN LAING PLC. Vintners Place, Upper Thames Street, Queenhithe, London, 30/04/1991. A view of the basement excavations below the transfer deck at Vintners Place showing the large diameter piles supporting the steel frame of the superstructure. Laing undertook the £79m management contract for the construction of a 37,000sqm high quality office development at Vintners Place between March 1989 and December 1992.  Work on site began in June 1989 with the demolition of 10 buildings including Vintry House and Kennet Wharf on the riverside.  The listed façade of Thames House along Queen Street Place was preserved and incorporated into the development.  The project was the first within the City of London in modern times permitted to reclaim land from the Thames foreshore for its riverside facade.  319 secant piles were bored for the perimeter foundation wall with 90 large diameter under-reamed piles for the main foundations and 84 contiguous piles within the coffer dam.
Compartir
pinterestPinterest
twitterTwitter
facebookFacebook
emailEmail

Añadir a otro lightbox

Añadir a otro lightbox

add to lightbox print share
¿Ya tienes cuenta? Iniciar sesión
¿No tienes cuenta? Regístrate
Compra esta imagen. Selecciona el uso:
Cargando...
Título:
Vintners Place, Upper Thames Street, Queenhithe, London,30/04/1991. Creator: John Laing plc.
Vintners Place, Upper Thames Street, Queenhithe, London, 30/04/1991. A view of the basement excavations below the transfer deck at Vintners Place showing the large diameter piles supporting the steel frame of the superstructure. Laing undertook the £79m management contract for the construction of a 37,000sqm high quality office development at Vintners Place between March 1989 and December 1992. Work on site began in June 1989 with the demolition of 10 buildings including Vintry House and Kennet Wharf on the riverside. The listed façade of Thames House along Queen Street Place was preserved and incorporated into the development. The project was the first within the City of London in modern times permitted to reclaim land from the Thames foreshore for its riverside facade. 319 secant piles were bored for the perimeter foundation wall with 90 large diameter under-reamed piles for the main foundations and 84 contiguous piles within the coffer dam.
Personas:
Técnica/material:
Fotografía
Crédito:
Album / Historic England Archive/Heritage Images
Autorizaciones:
Modelo: No - Propiedad: No
¿Preguntas relacionadas con los derechos?
Tamaño imagen:
4723 x 4739 px | 64.0 MB
Tamaño impresión:
40.0 x 40.1 cm | 15.7 x 15.8 in (300 dpi)