No disponible en alta resolución vía web. Entrega en 24 horas.
Título: 3 Minster Court, Mincing Lane, City of London,01/10/1993. Creator: John Laing plc.
Descripción: Ver traducción automática
Traduciendo...
Traducción automática:
3 Minster Court, Mincing Lane, City of London, 01/10/1993. A view of 3 Minster Court, taken from the south-east across Great Tower Street. In October 1990, Laing’s London division were awarded the contract for the fitting out of the new London Underwriting Centre at No.3 Minster Court. Key parts of the contract included altering steelwork to enable 16 escalators to be suspended in the atrium, creating dining and kitchen areas on the mezzanine level and the installation of raised floors and suspended ceilings. In August 1991, the team faced a huge setback as the site was severely damaged by fire. The flames swept through the central atrium and burst through the roof. A new Laing team was formed to restore the building after the disaster, and work was finally completed in late 1993.
Técnica/material: Fotografía
Crédito: Album / Historic England Archive/Heritage Images
Tamaño imagen: 6669 × 5260 px | 100.4 MB
Tamaño impresión: 56.5 × 44.5 cm | 2625.6 × 2070.9 in (300 dpi)