alb3486676

October 25, 2017 - San Diego, California, U.S. - This entry is built by Caddell Construction Co., (DE) LLC, of Montgomery Alabama and is made from material other than concrete. The six contractors constructing eight prototype border wall sections on Otay Mesa have finished their entries in the competition to build President Trump's border wall. The entries will sit for 30 days then be evaluated as to their effectiveness. (Credit Image: © John Gibbins/zReportage.com via ZUMA Wire). 25/10/2017

October 25, 2017 - San Diego, California, U.S. - This entry is built by Caddell Construction Co., (DE) LLC, of Montgomery Alabama and is made from material other than concrete. The six contractors constructing eight prototype border wall sections on Otay Mesa have finished their entries in the competition to build President Trump's border wall. The entries will sit for 30 days then be evaluated as to their effectiveness. (Credit Image: © John Gibbins/zReportage.com via ZUMA Wire). 25/10/2017
Compartir
pinterestPinterest
twitterTwitter
facebookFacebook
emailEmail

Añadir a otro lightbox

Añadir a otro lightbox

add to lightbox print share
¿Ya tienes cuenta? Iniciar sesión
¿No tienes cuenta? Regístrate
Compra esta imagen. Selecciona el uso:
Cargando...
October 25, 2017 - San Diego, California, U.S. - This entry is built by Caddell Construction Co., (DE) LLC, of Montgomery Alabama and is made from material other than concrete. The six contractors constructing eight prototype border wall sections on Otay Mesa have finished their entries in the competition to build President Trump's border wall. The entries will sit for 30 days then be evaluated as to their effectiveness. (Credit Image: © John Gibbins/zReportage.com via ZUMA Wire)
Reportaje:
Reportaje:
Crédito:
Album / KPA-ZUMA
Autorizaciones:
Modelo: No - Propiedad: No
¿Preguntas relacionadas con los derechos?
Tamaño imagen:
2400 x 1357 px | 9.3 MB
Tamaño impresión:
20.3 x 11.5 cm | 8.0 x 4.5 in (300 dpi)
Palabras clave:
FRONTERA LIMITE MURO