Lightboxes
Carrito
Iniciar sesión
alb3486676
October 25, 2017 - San Diego, California, U.S. - This entry is built by Caddell Construction Co., (DE) LLC, of Montgomery Alabama and is made from material other than concrete. The six contractors constructing eight prototype border wall sections on Otay Mesa have finished their entries in the competition to build President Trump's border wall. The entries will sit for 30 days then be evaluated as to their effectiveness. (Credit Image: © John Gibbins/zReportage.com via ZUMA Wire). 25/10/2017
Compartir
Pinterest
Twitter
Facebook
Copiar enlace
Email
Añadir a otro lightbox
Añadir a otro lightbox
¿Ya tienes cuenta?
Iniciar sesión
¿No tienes cuenta?
Regístrate
Compra esta imagen. Selecciona el uso:
Para otros usos,
solicita presupuesto a medida
Descripción:
Ver traducción automática
Traduciendo...
Traducción automática:
October 25, 2017 - San Diego, California, U.S. - This entry is built by Caddell Construction Co., (DE) LLC, of Montgomery Alabama and is made from material other than concrete. The six contractors constructing eight prototype border wall sections on Otay Mesa have finished their entries in the competition to build President Trump's border wall. The entries will sit for 30 days then be evaluated as to their effectiveness. (Credit Image: © John Gibbins/zReportage.com via ZUMA Wire)
Reportaje:
Trump's WALL
Reportaje:
El Muro de Trump
Crédito:
Album / KPA-ZUMA
Autorizaciones:
Modelo: No - Propiedad: No
¿Preguntas relacionadas con los derechos?
Tamaño imagen:
2400 x 1357 px | 9.3 MB
Tamaño impresión:
20.3 x 11.5 cm | 8.0 x 4.5 in (300 dpi)
Palabras clave:
FRONTERA
•
LIMITE
•
MURO
No disponible en alta resolución vía web. Entrega en 24 horas.