JOHN LAING PLC. Construction of a multi-storey block of 'Sectra' flats in Manchester,09/07/1963. Creator: John Laing plc.

JOHN LAING PLC. Construction of a multi-storey block of 'Sectra' flats in Manchester, 09/07/1963. Looking up at a worker ascending a concrete staircase during the construction of a multi-storey block of 'Sectra' flats in Manchester. 'Sectra’ was a French prefabricated steel formwork design for flats which John Laing and Son Ltd acquired the British rights to in 1962. It was a method of using precision made steel formwork for the placing of structural concrete in 'tunnel' sections in room unit widths and ceiling heights. The units were bolted together in rows on special tracks, with the concrete poured to form the walls and floors in one operation. The formwork was internally heated to accelerate the hardening of the concrete in the mould and the sections were then lifted into position by a tower crane on the construction site.
Partager
pinterestPinterest
twitterTwitter
facebookFacebook
emailEmail

Ajouter à une autre Lightbox

Ajouter à une autre Lightbox

add to lightbox print share
Avez-vous déjà un compte? S'identifier
Vous n'avez pas de compte ? S'inscrire
Acheter cette image
Chargement...
Auteur:
Titre:
Construction of a multi-storey block of 'Sectra' flats in Manchester,09/07/1963. Creator: John Laing plc.
Construction of a multi-storey block of 'Sectra' flats in Manchester, 09/07/1963. Looking up at a worker ascending a concrete staircase during the construction of a multi-storey block of 'Sectra' flats in Manchester. 'Sectra’ was a French prefabricated steel formwork design for flats which John Laing and Son Ltd acquired the British rights to in 1962. It was a method of using precision made steel formwork for the placing of structural concrete in 'tunnel' sections in room unit widths and ceiling heights. The units were bolted together in rows on special tracks, with the concrete poured to form the walls and floors in one operation. The formwork was internally heated to accelerate the hardening of the concrete in the mould and the sections were then lifted into position by a tower crane on the construction site.
Personnalités:
Technique/matériel:
Fotografía
Crédit:
Album / Historic England Archive/Heritage Images
Autorisations:
Modèle: Non - Propriété: Non
Questions sur les droits?
Taille de l'image:
5312 x 6752 px | 102.6 MB
Taille d'impression:
45.0 x 57.2 cm | 17.7 x 22.5 in (300 dpi)