Erection is well advanced on AEI 400,000 volt air-blast circuit-breakers at the Camden Power Station, Transvaal, of the Electricity Supply Commission of South Africa. These are the first 400kV circuit-breakers to be exported from Britain and the first to be isntalled in the Southern Hemisphere. They were manufactured at the Trafford Park, Manchester, factory of the AEI switchgear Division. - Photo dated 1st November 1966. ©TopFoto.

Erection is well advanced on AEI 400,000 volt air-blast circuit-breakers at the Camden Power Station, Transvaal, of the Electricity Supply Commission of South Africa. These are the first 400kV circuit-breakers to be exported from Britain and the first to be isntalled in the Southern Hemisphere. They were manufactured at the Trafford Park, Manchester, factory of the AEI switchgear Division. - Photo dated 1st November 1966. ©TopFoto.
Partager
pinterestPinterest
twitterTwitter
facebookFacebook
emailEmail

Ajouter à une autre Lightbox

Ajouter à une autre Lightbox

add to lightbox print share
Avez-vous déjà un compte? S'identifier
Vous n'avez pas de compte ? S'inscrire
Acheter cette image. Sélectionnez l'usage:
Chargement...
Légende: Voir la traduction automatique
Erection is well advanced on AEI 400,000 volt air-blast circuit-breakers at the Camden Power Station, Transvaal, of the Electricity Supply Commission of South Africa. These are the first 400kV circuit-breakers to be exported from Britain and the first to be isntalled in the Southern Hemisphere. They were manufactured at the Trafford Park, Manchester, factory of the AEI switchgear Division. - Photo dated 1st November 1966. ©TopFoto
Crédit: Album / TopFoto
Autorisations: ? Autorisation de modèle: Non - ? Autorisation de propriété: Non
Questions sur les droits?
Taille de l'image: 5286 × 4029 px | 60.9 MB
Taille d'impression: 44.8 × 34.1 cm | 2081.1 × 1586.2 in (300 dpi)