alb8394539

Rock miners working on the top platform of the tunnelling jumbo in the Eucumbene Tumut tunnel. The jumbo has three platforms and a fourth group of men work from the tunnel floor.1949:The Snowy Mountains project was initiated. ***** as one of the biggest civil engineering works in progress ***** in the world. Scheduled for completion by 1975, the Snowy water sources.***** the project cost. April 29, 1955. (Photo by S.M.H.E.A. Official Photograph).

Rock miners working on the top platform of the tunnelling jumbo in the Eucumbene Tumut tunnel. The jumbo has three platforms and a fourth group of men work from the tunnel floor.1949:The Snowy Mountains project was initiated. ***** as one of the biggest civil engineering works in progress ***** in the world. Scheduled for completion by 1975, the Snowy water sources.***** the project cost. April 29, 1955. (Photo by S.M.H.E.A. Official Photograph).
Partager
pinterestPinterest
twitterTwitter
facebookFacebook
emailEmail

Ajouter à une autre Lightbox

Ajouter à une autre Lightbox

add to lightbox print share
Avez-vous déjà un compte? S'identifier
Vous n'avez pas de compte ? S'inscrire
Acheter cette image
Chargement...
Rock miners working on the top platform of the tunnelling jumbo in the Eucumbene Tumut tunnel. The jumbo has three platforms and a fourth group of men work from the tunnel floor.1949:The Snowy Mountains project was initiated. ***** as one of the biggest civil engineering works in progress ***** in the world. Scheduled for completion by 1975, the Snowy water sources.***** the project cost. April 29, 1955. (Photo by S.M.H.E.A. Official Photograph).
Crédit:
Album / SuperStock / Sydney Morning Herald
Autorisations:
Modèle: Non - Propriété: Non
Questions sur les droits?
Taille de l'image:
2357 x 1737 px | 11.7 MB
Taille d'impression:
20.0 x 14.7 cm | 7.9 x 5.8 in (300 dpi)
Mots clés: